The hydrant stands up to 30 above the roof for easy hose access.
How long to install a roof hydrant.
The process is quite simple too.
This mild climate roof hydrant features.
Please let us know here why this post is inappropriate.
Also their are some exceptions about roof slope i believe if it exceeds 6 in 12 you do not have to install a roof manifold.
Z1388xl lead free roof hydrant.
As long as the stairway accesses the roof you do not have to install the roof manifold.
Install a 90 degree elbow and an mip adapter onto the bottom of the water hydrant standpipe using plumber s tape tightening the fittings with tongue and groove pliers the mip adapter has male threads that attach to the elbow as well as a smooth slip socket that you will solvent glue to the pvc water supply pipe.
Ultimately it will depend on the size of your dwelling.
Zurn s non freeze technology provides convenient half turn functionality with long lasting durability offering low maintenance and proven performance.
A qualified littleton roofer can install a new roof in as little as two days.
Exposed lead free non freeze roof hydrant.
Install hydrant with drain hole below frost line.
Use wrenches on supply line fitting and brass valve body only.
Reasons such as off topic duplicates flames illegal.
Necessary to install hydrant when the patented mounting system is bolted to the roof.
This avoids over tightening the hydrant assembly which could affect operation.
The mounting system utilizes a 3 opening that allows the hydrant to be installed later if desired.
The hydrant valve is connected to the supply piping in the heated portion of the structure and is self draining eliminating the possibility of freezing.
Red flag this post.
All necessary mounting hardware for proper installation on a commercial roof is supplied including a 2 degree shim for pitch adjustment.
Add the mip adapter.
Designed with commercial rooftops in mind a rooftop hydrant can help prevent injury and increase efficiency by reducing long hose runs provides ease of access to water for window washing condenser coil cleaning cooling towers or green roofs.
Hydrant features a dura coated cast iron head and lift handle with lock option galvanized steel casing bronze and stainless steel interior components 3 4 19 inlet connection with 1 8 3 tapped drain port on housing and 3 4 19 male hose connection.
Lead free hydrants offer a safe water option for building owners and engineers seeking specification grade hydrants with exceptional performance and value.
Ultimately it will depend on the size of your dwelling.