Below the shingles on the high side of the gutter run.
How to atach a gutter.
Cut a starter hole in the gutter with a chisel drill or sabre saw and nibble out the finished opening with tin snips.
Use needlenosed pliers to slightly crimp the elbow to fit into the downspout as shown.
When installing gutters set the proper slope by driving a nail 1 2 in.
Cut the downspout hole at the bottom end of the gutter and attach the gutter end caps.
For every 10 feet of gutter from this measurement and mark this distance at the low end of the gutter run.
Armed with a drill long wood screws and the gutter materials attaching gutters to.
Typically you ll need a.
Measure and record the distance from the bottom of the fascia board to this nail.
If a gutter run will measure longer than 40 feet 12 m the gutter should be positioned to pitch down from the middle aimed toward a downspout at each end.
Measure in 4 inches from the end corner of the gutter with a tape measure and mark the bottom of the gutter with a pencil.
Afterward attach the fascia brackets to using 1 4 inch 0 64 cm stainless steel lag screws at least 2 inches 5 1 cm long.
Attach the gutter s fascia brackets to the rafter tails.
Drill a 1 8 inch 0 32 cm pilot hole through the fascia and into the rafter tails at each chalk mark.
Hold another elbow against the house and cut a piece of downspout to fit between the two elbows.
Screw a downspout elbow to the outlet tube protruding down from the gutter.
Secure the downspout outlet to the gutter with four pop rivets or screws.
Use the flange to mark the screwhole locations and bore 1 8 in holes through the gutter.
Attaching a gutter to metal roofing is a simple process so long as you have the wood rafter tails to screw gutter brackets into.
Place a step ladder under the area you are installing the downspout.
Gutters should be attached to the fascia and run the entire length of the roof ending with a downspout.
Step 2 drill a hole in the bottom of the gutter at the 4 inch mark with a 1 inch hole saw attachment to the drill.